Product Parameters
Description |
Product name |
Hiking Outdoor Extreme Cold Weather three season Olive Mummy Camouflage Camping Sleeping Bag |
material |
100% NYLON / POLYESTER or Customized |
Handle/Strap Type |
Soft Handle or Customized |
Capacity |
Warm |
Funication |
4 Season Mummy Expedition Sleeping Bag |
Lining Material |
Polyester or Customized |
Color |
Navy/Red/Black/Blue/Kakhi/camo or Customized |
Sample Time |
3-7Business Days |
Interior |
Polyester or Customized |
Product Description
- Made from high-quality materials such as 100% Wool, cotton or Polyester as Customized.
- Made for comfort and warmth, even in the most extreme conditions.
- The 'mummy' style it is wider at the top and tapers down to your feet at the bottom of the bag. The hood contains plenty of padding meaning it can be used as a pillow and can also be cinched around your head.
- Stuffed with highly siliconised synthetic fibres this bag contains masses of insulation and has a low-temperature rating of minus 17° Celsius.
- he outer fabric is also tough enough to cope with rough conditions if you are lying it directly onto the ground.
-Water repellent outer fabric,Double-sided zip for ease of access,Velcro fastening at neck.
-Highly insulated hood that could be used as a pillow



Here you will get product of High-rated quality materials, professional performance, great service.
PRODUCTION LINE
CERTIFICATE
FAQ
FAQ
1. What is your MOQ?
MOQ based on your detail requirement.
Small order and sample order are also welcome.
If we have stock, can meet all you required tiny order.
2.How can we get sample?
We can provide sample according to your requirement.
Provide customized service.
3.How to issue order?
Firstly,Let us know your idea, drawings or original samples .
Secondly, We will send you sample to check the quality and spefication.
Thirdly, Confirm the order and get your deposit 30% .
Finally, Arrange production and Ship the goods after get your balance payment .
4.How long the sample time and production time?
Sample lead time: 7-10days
Production lead time: 30-45days, can be negotiated.
5.How to guarantee quality?
We have professional QC team will inspect 100% goods during production.